Test of CM13 is finished and it almost ready for departure. Several non-conformities were noted. The main of them: He signal is detected during warm up process around 11 K, as in few previous CMs. The peak is lower than in CM09 that was sent to ESS. And strange behavior of CTS.
Additional note: The middle part of cryogenic lines is less flexible than usual. Wherever, after checking the model with Nikolas and CM13 in FREIA hall, another flexibility point (line) was mentioned. Therefore, Nuno’s concerns about it effect during cryo operations are refuted.
The report writing is ongoing and FREIA need few days more for it.
Carl S. will travel to ESS May 7th for the first CM04 cooling down in a tunnel.
The date and content for CM13 departure were discussed. After the meeting it was clarified by Paolo, the this time FREIA will send: CM13, CM13 Ancillary boxes, CM02 Ancillary boxes, CM Frame (currently at Uppsala, regular doorknobs setup need to be disconnecting from it before sending ). The departure date: May 31th. Then IJCLab will send with CM14 to UU: CM14, CM14 Ancillary boxes and the white CM Frame.
The contribution to the SRF 2023 conference was discussed by FREIA team and Akira, as it was outside of specified 1 hour meeting and others participants had time limitation.