  1. CM02 (3rd test) arrived to FREIA May, 15th. It is currently fully connected in the bunker, and pumping of beam line ongoing.
  2. The shockloggers, as usually, showed the biggest events during loading and unloading the CM. 
  3. TT07 sensor doesn’t work.
  4. The metal plate for changing the opening of gate vale is missing for CavIn (where RGA connected). The gate in a ”half open” position. It possible to pump like this.
  5. CN02 arrived with different connectors for TT120/220 and EH12/22. They were adapted to usual for FREIA.
  6. The strategy for the coupler conditioning was discussed: follow usual procedure with more conservative values and paying attention to e-pick up signal. We agreed to stop conditioning out of working hours.
  7. The next meeting will be set on demand. Email with news/results will be send around. 