Use Single SignOn (SSO) to login with your home institute's login service and credentials.

ESS Cryomodule Testing Meeting

Europe/Stockholm
  • UU showed CM09_2's heat load measurements + field emission and the leak test results
  • UU confirmed a leak inside the module but UU suggests that it is sufficiently small not to be a show stopper
    • Final decision is on ESS
  • UU showed the same plots of CM12 and argued that the leak is even smaller than CM09_2 so we do not need to test CM12 again
  • CM09_2 can be shipped to ESS in W3 January with one supporting frame (--> Phillipe will check the date)
  • UU suggested that CM13 can be tested with a new set of stepper motors before ESS and IJCLab decide to replace all
There are minutes attached to this event. Show them.
The agenda of this meeting is empty