Use Single SignOn (SSO) to login with your home institute's login service and credentials.

ESS Cryomodule meeting

Europe/Stockholm
zoom

zoom

  1. Because of venting accident in ESS, the spare CM14 is needed for installation in the tunnel as a replacement for CM02. 
  2. As CM14 arrived to FREIA with new type of motors, the motors re-assembly (to the old type) are required before cold test. 
  3. The plan at FREIA for CM14 need to be changed to the next: 
    W10: disconnect CM14 and move outside of bunker.
    W11: ESS team will come to FREIA to change the motors with the tools. 
    W12-16: FREIA will continue the usual tests with CM14. 
There are minutes attached to this event. Show them.
The agenda of this meeting is empty