Use Single SignOn (SSO) to login with your home institute's login service and credentials.

ESS Cryomodule meeting

Europe/Stockholm
zoom

zoom

  1. CM14 is under the test, vacuum pumping is ongoing and tomorrow the additional warm coupler conditioning is possible. 
  2. FREIA started He liquifier first time after long 2 months stop and plan to cooldown the CM14 during W13.  
  3.  W13 is possible time for Artur's visit. 
  4.  W14 is possible slot for ESS team and Akira visit to join MP conditioning and heat load measurement. 
  5. We are aiming to end CM14 and sent to ESS W16. 
There are minutes attached to this event. Show them.
The agenda of this meeting is empty